Burrito King (a new fast food franchise opening up nationwide) has successfully automated burrito production for its drive up fast food establishments. The Burro Master
in Other (Education) by vommsYour Price: $2.50 (30% discount)
You Save: $1.07
Description
*This was a difficult assignment which took me several hours to complete. I got an A on it. Use my work as a guide so you can understand how to complete the assignment
Assignment Instructions:
Burrito King (a new fast-food franchise opening up nationwide) has successfully automated burrito production for its drive-up fast-food establishments. The Burro-Master 9000 requires a constant 45 seconds to produce a batch of burritos. It has been estimated that customers will arrive at the drive-up window according to a Poison distribution at an average of one every 50 seconds. To help determine the amount of space needed for the line at the drive-up window, Burrito King would like to know the expected average time in the system, the average line length (in cars), and the average number of cars in the system (both in line and at the window). ANSWER:
We have 45 and 50 Expected average time is given by:- WQ LQ/ 1/ 1/50
Average line length is...